View as a Webpage @{mv_date_M/d/yyyy}@
CASE STUDY TITLE
DOWNLOAD FREE CASE STUDY!

When it comes to steel mills with blast furnaces, it’s hard to imagine the need for mechanical HVAC equipment to provide additional heat for the facility

Before a 50,000 lb. roll of high-quality Big River Steel leaves the plant, it goes through the Finishing Mill where massive rolls of steel are pickled, galvanized, or annealed. As these rolls are waiting to be processed, they are susceptible to environmental conditions. If the temperature inside the Finishing Mill falls below the dew point temperature, flash rusting can occur within 24-hours causing revenue loss if the steel has to be scrapped.

Cambridge HTHV units in the Finishing Mill protect the coiled steel, keeping the air warm, dry, and above the dew point preventing moisture from forming on the rolls.

read full case study online

COMPANY NAME


More from Engineered Systems

Moving Beyond the Wells-Riley Equation
If we're truly going to manage indoor environments for occupant health, we need to extend our understanding and management of IAQ to encompass more than the number of microbes in the air.
Read More
 

ASHRAE Conference, AHR Expo Forecast the HVACR Industry's Decarbonized Future
After a brief hiatus, AHR Expo visitors were met with an abundance of innovation, as 1,573 exhibitors filled 443,769 square feet of exhibit space.
Read More
 

Project Management - More Than Just Being Good At Communication
Proactive communication among all entities is critical to the specific project success, but it needs to be backed up with more than just talk.
Read More

070821